Robot programming
Additional robot platforms.
Learn more →KUKA programming, commissioning, plant integration and optimisation, including KRC systems, PLC interfaces, tools, peripherals and production sequences.
FIWAtec combines software, commissioning and plant-level understanding. The exact scope is aligned with the installed hardware, standards and production requirements.

Stable automatic operation depends on clearly defined states, handshakes and fault reactions between robot, PLC and station equipment.
We assess motions, wait conditions, transfers and process times while preserving process reliability and diagnostics.
Industrial projects often require several disciplines to work together.
Additional robot platforms.
Learn more →Plant controls and communication.
Learn more →Ramp-up and retrofit.
Learn more →In KUKA cells, motion programs, PLC interfaces, operating modes, tools, bases and restart behaviour are tightly coupled. Changes therefore have to be assessed in the context of the whole cell sequence, not only as individual motions.
Before changes, actual machine states, software version, hardware, interfaces and dependencies are captured. This creates a reliable baseline instead of assumptions.
Operating modes, commands, feedback, timeouts and fault reactions are structured explicitly. This makes commissioning, diagnostics and future expansion easier.
Changes are not tested only for the ideal cycle. Manual mode, automatic mode, faults, communication interruptions and restart behaviour are tested and documented for the machine.
Yes. Clear commands, feedback, program selection, start conditions, fault response and acknowledgement are essential.
Yes. Motions, advance-run behaviour, signal dependencies and process conditions are reviewed together before changes are made.
Yes. Tool and workpiece state are part of the sequence and must be handled explicitly during stops and restarts.
Yes. A consistent state model on both sides is especially important in robot integration projects.