Siemens TIA Portal
S7-1200/1500, WinCC and Siemens integration.
Learn more →Development, extension, diagnostics and commissioning of PLC systems – with a focus on Siemens TIA Portal plus Beckhoff, CODESYS, Rockwell and industrial communication.
FIWAtec combines software, commissioning and plant-level understanding. The exact scope is aligned with the installed hardware, standards and production requirements.
Clear state models, understandable interfaces, diagnostics and consistent fault response make commissioning and future modifications easier.
PLC projects do not stop at the CPU. We consider fieldbuses, safe states, HMI, robot handshakes, distributed I/O and third-party systems.
Industrial projects often require several disciplines to work together.
S7-1200/1500, WinCC and Siemens integration.
Learn more →PLC-to-robot interfaces and integration.
Learn more →Troubleshooting and ramp-up.
Learn more →PLC software must do more than look plausible in an offline test. It has to behave predictably under real machine conditions, with explicit operating modes, traceable permissions, defined fault reactions and diagnostics that support commissioning and maintenance.
Before changes, actual machine states, software version, hardware, interfaces and dependencies are captured. This creates a reliable baseline instead of assumptions.
Operating modes, commands, feedback, timeouts and fault reactions are structured explicitly. This makes commissioning, diagnostics and future expansion easier.
Changes are not tested only for the ideal cycle. Manual mode, automatic mode, faults, communication interruptions and restart behaviour are tested and documented for the machine.
The main focus is Siemens TIA Portal and STEP 7. The FIWAtec portfolio also includes Beckhoff/TwinCAT, CODESYS, Rockwell and Phoenix Contact.
Yes. Existing modes, interfaces and dependencies are reviewed first so proven machine behaviour is preserved.
Yes. PLC engineering is considered together with I/O tests, communication, manual mode, automatic sequence, diagnostics and production ramp-up.
By following hardware status, communication, signal states, sequence logic and fault reactions instead of changing code at random.