Process & cycle-time optimisation for PLC and robot systems

We examine real machine cycles across PLCs, robots, peripherals and the process itself. Using sequence data, program logic and observations at the machine, we remove unnecessary waits, improve handovers and shorten cycle times without compromising diagnostics, process stability or reliable restart behaviour.

Scope

Engineering with the complete system in mind

We assess the interaction between controls, robots, tooling, sensors, drives, vision systems and material flow rather than optimising one isolated code block. Robots can be programmed and simulated offline from existing CAD/3D plant models. Reachability, collisions, tool poses, paths and handovers can therefore be prepared before final tuning at the physical machine.

  • Sequence and cycle-time analysis from the start signal to completed handover
  • Analysis of unnecessary waits, timeouts and sequential permissions
  • Optimisation of PLC state sequences, handshakes and useful parallel execution
  • Offline robot programming and simulation in CAD/3D environments
  • Reachability, collision, tool-pose and robot-path checks
  • Optimisation of robot motion, handovers and process points at the machine
  • Interface analysis across PLCs, robots, vision systems, drives and peripherals
  • Measurable before/after assessment using available cycle and project data
Automated production cell for process optimisation
System optimisation

Cycle time is not created at one single point

Total cycle time is made up of many dependent steps: robot paths, PLC permissions, sensor response, tool changes, vision checks, process time, material supply and the handover to the next station. A fast local motion adds little if the sequence then waits for a missing permission or another process.

We therefore examine the complete chain, separate technically required process time from avoidable waiting and identify steps that can safely run in parallel. Measurement points, program states and traceable before/after values show whether a change genuinely saves time.

Stability first

Optimisation must remain production-ready

A shorter cycle is only an improvement when quality, process safety, diagnostics and restart behaviour remain controllable. Margins are therefore not removed blindly: edge cases, component tolerances, communication times and real fault conditions still need to be handled safely.

Changes are structured, versioned and checked in manual mode, automatic mode and defined fault scenarios. The target is not a one-off record cycle but a repeatable production sequence that maintenance and operating teams can understand and restart reliably.

Related

Related services

Cycle-time and process optimisation usually spans several engineering disciplines. Robot motion, PLC logic and commissioning are therefore aligned with the real production sequence as one system.

01

Robot programming

Path planning, CAD/3D-based offline programming, collision checks and optimisation of motions, tool poses, handovers and process points.

Learn more →
02

PLC programming

Analysis and refinement of sequences, permissions, handshakes, timeouts and diagnostics for explicit, efficiently parallelised operation.

Learn more →
03

Commissioning & retrofit

Controlled implementation at the machine with a secured baseline, coordinated test stages, production support and documented handover.